Transport Technical Paper [EXAM 114]
Search representations
Results for Mr John Savill search
New searchObject
Transport Technical Paper [EXAM 114]
3. Appendix 1: Sustainable Transport in Central Bedfordshire
Representation ID: 14742
Received: 12/08/2020
Respondent: Mr John Savill
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Representation Summary:
In summary the Junction 13 traffic mitigation methods are flawed due to the methodology of the traffic forecasts failing to adequately consider the effect of the Oxford top Cambridge Expressway.
A02
P07
The traffic proposals agreed with Highways England on Junction 13 of the M1 and the proposals themselves are flawed. CBC cannot be relied on to deliver infrastructure, with specific reference to the Milton Keynes to Bedford waterway proposals as an example.
For instructions on how to use the system and make comments, please see our help guide.